Monday, January 12, 2009
Tail Block
Friday, November 7, 2008
The Rails
Between now and Christmas I don't think I will get much more done, off now to San Fran for some work for a week or so, but I have a bit of forward thinking to do with regard to my fin box position and I need more glue which I have to source from the web. So although nothing constructive to be done on the surfboard, a bit of planning is still going ahead.
Tuesday, September 30, 2008
Delays due to enjoyment of summer
It’s been a while nearly 3 months since I got back to the attic to do anything on the board, really falling behind. With the heat in the attic in the summer its not a nice place to be, and then with holidays and lots of weekends west there wasn't much other time to devote to the board building as well. And sure Tyrone winning a third All-Ireland kept me off the tracks as well. But Autumn coming in now so I will be full at it I hope.
Tuesday, July 1, 2008
Adding the Chine Strip/Nose Block
The next step is to place a Chine strip around the board from the tail to the nose. This line for the Chine strip is very important as it is basically your real outline of the shape of the board so important to get it looking right.
The Chine Strip as in pic 1 you will see I am trying to bend it right around the nose to get a full solid piece around that part without having to make a joint on the nose.

To bend these strips the old iron and wet towel is called out and loads of patience, it will come right just takes time. In the end I don't feel comfortable with it so I decide I will put in a solid nose and so only need to run the chine strip up till that last frame.(pic 2)

Tuesday, June 3, 2008
Releasing the Clamps
So the clamps are all released and for the first time I get to see the start of an exciting build. It’s at this stage that you can really appreciate the effort when you can see a glimpse of a final shape coming together. The next few pics are taken after all the weight is lifted off and clamps all removed. I let the glue dry about 4 days. It does need at least 24 hours but I was in no rush and I wanted to be sure I had a good contact made.Friday, May 30, 2008
Framework to Bottom Planks
Once the planks were given enough time to bond together, I repeated the same for the bottom planks. After a few days then I roughly cut out the outline of my board leaving a good couple of inches outside of the framework to still work with. Now I can add the framework to the bottom planks. Putting the framework together is fairly easy, it fits very snugly but do add some glue also to ensure
no movement. This framework is going to come under a lot of pressure when being glued to the bottom planks. As you see in pic 1 I have already cut the bottom planks to a rough outline of the board. Starting to take shape!! I am now adding the 3m 5200 fast cure sealant to the bottom of the framework. You will need a spare of hands here, not just for the camera but when this glue goes down you don't have much time to work with. You also must ensure you have the centre keel in line with the exact middle of the board and it needs to be straight the whole way through the board. Any mistakes here could have your whole board off through the rest of the bui
ld. Looking at pics 2 and 3
this might look a mess but it had to be this way and it worked anyhow. From these pics you will see why a spare pair of hands were needed, a few dry runs were done first to ensure this clamping system would work, we used the rafters above us to push down onto each frame. A lot of weight used also, parts of slabs, bench weights, remember you have to try and force the planks to take to the shape to the Rocker Table and framework. Whew....now this is all done we can leave for at least a couple of days and hopefully when I come back to take of the clamps the planks will have formed to the framework and held its shape. A drink would be nice now!!
no movement. This framework is going to come under a lot of pressure when being glued to the bottom planks. As you see in pic 1 I have already cut the bottom planks to a rough outline of the board. Starting to take shape!! I am now adding the 3m 5200 fast cure sealant to the bottom of the framework. You will need a spare of hands here, not just for the camera but when this glue goes down you don't have much time to work with. You also must ensure you have the centre keel in line with the exact middle of the board and it needs to be straight the whole way through the board. Any mistakes here could have your whole board off through the rest of the bui
ld. Looking at pics 2 and 3
this might look a mess but it had to be this way and it worked anyhow. From these pics you will see why a spare pair of hands were needed, a few dry runs were done first to ensure this clamping system would work, we used the rafters above us to push down onto each frame. A lot of weight used also, parts of slabs, bench weights, remember you have to try and force the planks to take to the shape to the Rocker Table and framework. Whew....now this is all done we can leave for at least a couple of days and hopefully when I come back to take of the clamps the planks will have formed to the framework and held its shape. A drink would be nice now!!Thursday, March 27, 2008
Gluing Top Planks together
The next stage was to arrange and glue the top planks together and then the bottom planks. The planks all are about 10’ in length and you arrange them into how you would like to see your finished board. Grain had given me some nice timbers so I think mine turned out the best I could get with the cut woods given. The finished article will probably turn out much better when all sanded and varnished etc but I just can’t see it myself at the moment. From these photos you can't really see the true grains due to lighting, wet glue and probably poor camera shots. As you will also notice, an important device is the clamp. I still
never had enough but just had to make do or come up with ideas. The bar clamps can run pricey, I got 4 of them costing about €30 each, ouch! and I had over 20 spring clamps, still not enough for some later stages.
Subscribe to:
Posts (Atom)



